07 · Logistics and installations

Three views: board, list, calendar

The manager wants to see where the goods stand, the logistics coordinator wants a list that can be filtered, and the crew coordinator wants a calendar with free days. It is the same module in three views; a change in one is immediately visible in the others.

Why three views

The manager likes kanban (sees the flow), the logistics coordinator likes the list (filters, sorts, exports), the crew coordinator likes the calendar (plans days). The same data — three ways of working.

State is synchronised instantly between views. A status change on the board is visible in the list. Dragging on the calendar changes the kanban column. A bulk action on the list updates the board cards.

Board (kanban)

6 columns with the logistics pipeline statuses:

  • Pending — a fresh contract, waiting for the goods to be ordered
  • Ordered — goods ordered from the manufacturer
  • Partially ready — some of the goods in the warehouse
  • Ready — all items ready for installation
  • In progress — installation stages under way
  • Completed — all stages finished

A contract card shows number + status + amount + installation/delivery icon. Drag and drop between columns changes the status. When moving to “In progress”, the “Schedule” modal requires you to set an installation date.

List (table with filters)

A sortable table of all contracts. Top filters:

  • Status — tabs with counters (All, Pending, Ordered, ..., Completed)
  • Showroom, sales adviser, installer, date range
  • Presets: “overdue”, “no installer”, “today”, “this week”
  • Search by customer name or contract number

Rows can be selected (Shift+click for a range). The bulk actions bar at the bottom — change status, mark as completed, CSV export. A KPI strip above the table: total / today / overdue / no installer / gross total.

Installation calendar

A 7-day view with a grid: a column per day, a row per installer. The left column is the queue of contracts to schedule (status "Ready" or "In progress" with no date set).

Drag and drop: you drag a contract from the queue onto a day slot → the "Schedule" modal opens with the date and installer filled in. You confirm → the status changes to "In progress", the stage is saved and the card appears in the grid.

Unavailable days: click an empty cell → mark the crew's day as "unavailable" (holiday, sick leave, training). The slot stops accepting drops.

"Overdue" banner: a red bar above the calendar flags contracts whose stage date has passed while the status is still "In progress" — to be closed off.