Multi-stage installations
One contract carried out on several dates and by different crews. We describe how to split an installation into stages, what each stage stores and how the contract status keeps up with them being closed.
Why split an installation
The customer ordered windows, doors and roller blinds, but it won't all go in at once: the windows arrive in March, the doors in April, the blinds only after the facade is done. Instead of three contracts, or one with a date pulled out of thin air, the contract gets three stages.
There are usually several reasons for splitting, and it is rarely about the office's convenience: goods arrive in batches, crews are busy, the customer asks for the work to be spread over time, or the installation depends on someone else's work — window sills, plastering, the facade.
What a stage stores
- Number
- The stage's order within the contract: 1, 2, 3.
- Installation date
- The day the stage is scheduled for.
- Hours
- Start and end, both optional. When filled in, they keep the crew's calendar in order when there are several addresses on one day.
- Installer
- A team member or a subcontractor. Each stage can have a different one — the windows installed by your own crew, the blinds by an external company.
- Note
- One sentence for the crew: “once the plaster has dried”, “entrance from the back yard, key with the neighbour”.
- Completion marker
- The date and time the stage was ticked off as done.
Example: three stages
- Stage 1 — windows, 12 MarchYour own crew, 8:00–14:00. After the installation you tick off the stage; the contract stays in progress, because two stages are still waiting.
- Stage 2 — doors, 9 AprilThe same crew, note “RC3 front door, drop-down threshold seal”.
- Stage 3 — roller blinds, 20 MayA subcontractor. Once this stage is ticked off, the contract moves to “Completed” on its own.
The contract status keeps up on its own
You don't need to change the status by hand — the system makes sure it matches what is happening on site:
- Adding stages
- A pending, ordered or ready contract moves to In progress. The installation date on the contract is set to the date of the earliest stage.
- Ticking off one of several
- Nothing changes. The contract stays in progress as long as at least one stage is waiting.
- Ticking off the last one
- The contract moves to Completed.
- Unticking
- If it turns out a stage wasn't finished after all, the contract goes back from “Completed” to In progress.
- Deleting all stages
- The contract goes back to Ready and returns to the queue of contracts to schedule.
What this changes in your work
- In the calendar the contract appears as many times as it has stages — each on its own day and with its own crew.
- On the installation order a specific stage is printed, so the crew doesn't get a sheet listing work they aren't doing that day.
- In the queue of contracts to schedule the contract disappears once the first stage is added — it doesn't come back to the list with each further one.
Planning stages in the crew calendar is described in Three views, and the printouts for the crew in PDF printouts.