Alstre
Try it
07 · Logistics and installations

Scheduling an installation

The scheduling window gathers on the left everything the crew and the customer would ask about on the phone, and on the right gives you the stages form. We cover where you open it from, what it shows and what happens after you confirm.

Where you open it from

The window always appears at the same point in the workflow: when it is already known that the contract is going ahead, but no day has been set yet.

  • From the calendar — after dragging a contract from the queue onto a specific day; the date is filled in automatically.
  • From a status change — when you switch a contract to “In progress” on the list.
  • From the board — with a button on the contract card.
  • From the goods-ready reminder — a ready contract shows a highlighted button with a prompt to call the customer and arrange a date.

Left side: everything about the contract

This column exists so that you don't have to open a second tab while arranging a date over the phone. It gathers:

Customer and contact
Name, phone number, additional phone number, e-mail, tax or VAT number for a business, and for contracts with a business also the representative and the additional parties.
Installation address
Together with the person receiving on site, if it is someone other than the customer.
Who is in charge
Sales adviser, branch and surveyor — you know straight away whom to call for details.
Contract type and delivery
Installation or delivery only, and the expected delivery date of the goods. Without this it is easy to book a crew before the windows and doors arrive.
Property
Building type and usable floor area.
Scope of installation and technical conditions
The list of work carried over from the contract.
Four kinds of remarks
From the contract, the logistics note, access notes from the measurement and the surveyor's remarks. This is usually where you find the thing that decides how long the installation will take.
Contract line items
A list with dimensions and quantity, with a counter in the header.
Value and payments
Net, gross, payment method, lead time and the balance due date.

Right side: stages

Each stage has four fields:

Date
The installation day. It is filled in automatically when you opened the window by dragging in the calendar.
Time
Optional — useful when the crew has two addresses that day.
Installer
The list includes your own team and external crews.
Stage description
Briefly, what happens that day: removal, installation, finishing.

With the Add stage button you split the installation into several dates — each with its own date and crew. The rules governing stages are described in Multi-stage installations.

What “Confirm date” does

  • Saves the stages — replacing the whole existing list rather than adding to it.
  • Sets the installation date on the contract based on the earliest stage and assigns its installer.
  • Moves the contract to In progress if it was pending, ordered, partially ready or ready.
  • Deleting all stages moves the contract back to Ready and returns it to the queue.
Printing is a separate step
Confirming the date doesn't print anything. You download the installation order for the crew from the contract preview — PDF printouts.