Alstre
Try it
07 · Logistics and installations

PDF printouts

The installation order, the acceptance protocol and the contract — three documents the crew takes to site. We describe what goes on each of them, where the system takes the data from and how they change for delivery without installation.

Where you print from

All three printouts are in the contract preview — the panel that slides out from the right when you click the eye icon. You can open it both from a card in the installation calendar and from the logistics list, and the print buttons are at the bottom.

Each opens a ready PDF file in a new tab — from there straight to the printer or as an attachment to a message.

Installation order

A sheet for the crew that answers everything they would otherwise call the office about:

Customer and address
The customer's name, phone number and e-mail, the installation address, and next to it the person receiving on site and their phone number, if it is someone other than the customer.
Stages
Number, date, time, installer and remarks for each stage. If no dates have been set yet, a note that there are no stages is printed — the printout is not blocked because of it.
Specification
Sequence number, description, dimensions, room, colour and quantity.
Scope of installation
The list of work carried over from the contract.
Remarks
A highlighted box that collects up to five sources: remarks from the contract, the logistics note, access notes and the surveyor's remarks from the measurement record, and the technical conditions.
Signatures
Two places at the bottom: the installer's and the customer's — the latter confirms that the installation has been carried out.
Where the line items come from
The specification is taken from the measurement linked to the contract — which is why it has dimensions, rooms and colours. A contract without a measurement prints the items from the contract itself: the description and quantity remain, without dimensions.

Installation work acceptance protocol

A document to sign with the customer once the work is done. Its purpose is simple: to record the state on the day of acceptance before anyone has a chance to remember it differently.

  • Declaration with the acceptance date and confirmation that the work was carried out in accordance with the contract
  • Scope of accepted work — number, description, dimensions, room, quantity and an “OK” column to tick item by item
  • Warranty copied from the contract terms
  • Remarks and defects to be remedied — a lined field to fill in by hand, with space for the remedy deadline
  • Two checkboxes: accepted without reservations, or accepted with the reservations listed above
  • Signatures of the contractor and the customer
Print before setting off, not after
The protocol is filled in on site, with a pen. A crew that went without it goes back for the signature a second time — or calls asking for a photo from a phone, which is no substitute for the document.

Contract without installation

When the contract covers only a sale with delivery, both documents change their names and content — there is no point signing acceptance of work that nobody carried out:

Delivery order
Instead of the installation order. The sections refer to delivery stages and scope, and the customer signs for receipt of the goods, not for the installation. The technical conditions are not printed in the remarks at all.
Goods handover protocol
Instead of the work acceptance protocol, with the handover address in place of the installation address.

Contract printout

The third button opens the PDF of the contract itself. It is printed from the template marked as default in the company; if none has been chosen, the system uses the built-in standard version.

The document comes out with full company branding: logo, name, tax ID, address and bank transfer details. The account number is taken from the branch if it has its own account — otherwise from the company details. Document templates are described in the Document templates chapter.

Shared header and footer

The order and the protocol share a header and footer: the logo with the company details and tax ID, the issue date, the contract signing date and the number of the contract the document belongs to. The footer repeats the company name, address, tax ID and phone number — so that a sheet found on a building site tells you by itself whom to call.