Home/Features/Logistics and installations
Features · Logistics and installations

Crew calendar and status board. Date and crew set with a single drag.

Three views of the same module: a kanban of goods statuses, a filterable list and a 7-day crew calendar. Drag a contract from the queue onto a day and an installer — the modal opens with the date filled in and the full context in view. Multi-stage installations, subcontractors, and installation orders and acceptance protocols printed automatically.

Views
3
Statuses
6
PDF printouts
3
  • Drag and drop
  • Multi-stage
  • Subcontractors
  • Auto status
Three views

One module, three ways of working

The manager prefers the kanban, logistics prefers the list, the crew coordinator prefers the calendar — everyone sees the same data the way that suits them. Changes sync between the views instantly.

Board

A kanban of goods statuses — contract cards across 6 columns (Pending → Ordered → Partially ready → Ready → In progress → Completed). Dragging a card between columns changes its status.

List

A sortable, filterable table of every contract in progress. Filters: status, showroom, sales adviser, dates, and the presets "overdue" / "no installer" / "today". Bulk actions on the selected rows.

Installation calendar

A 7-day view with the dates booked for each installer. The left column holds the queue of contracts to schedule. Drag a contract from the queue onto a day slot → the "Schedule" modal opens with the date and crew filled in.

Why it matters

Phone calls, texts, spreadsheets —
over.

Logistics rings production: "are our windows ready?". Production calls back on the other line: "no, we're waiting for profiles". The first line types it into a spreadsheet nobody reads. The installation calendar keeps all of it in one place — the status changes with a drag, and the crew sees its day through a link on the phone.

A 6-status pipeline

A linear contract lifecycle in logistics

Each status is a specific point in the process — from the moment the contract is signed to the end of the last installation stage. Dragging between columns on the board updates the status; finishing stages updates it automatically.

01
Pending
A fresh contract, waiting for the goods to be ordered
02
Ordered
Goods ordered from the manufacturer
03
Partially ready
Some of the goods in the warehouse
04
Ready
All items in the warehouse, ready for installation
05
In progress
Installation stages under way
06
Completed
All stages finished
Features

Everything logistics needs

Drag and drop everywhere

A contract card moves from column to column (status change), from the queue onto a calendar day (scheduling) and between days (rescheduling). Every drag is saved straight away.

Multi-stage installation

One customer, one contract — but the installation in 3 stages (e.g. windows in March, doors in April, blinds in May). Each stage has its own date, time, installer and notes. The contract status moves on by itself once every stage is finished.

The "Schedule" modal

Opens on drag and drop or when the status changes to "In progress". Two columns: on the left the full context (address, scope, items, notes, warranty), on the right the stages form (date, time, installer, notes).

"Overdue" banner

A red bar above the calendar: "X calendar contracts overdue" — the stage date has passed and the status is still "In progress". One click → a filtered list to close off.

Subcontractors (external installers)

Crews from outside the company, with no login to the CRM. You add a name, phone number and e-mail. Assign them to several branches — one crew can serve a number of showrooms. Archive them without losing their history.

Unavailable days

Click a calendar cell to mark a crew's day as "unavailable" — holiday, sick leave, training. The slot stops accepting drops and the day is greyed out.

Installation date confirmed automatically

Set the first installation stage → the confirmed installation date on the contract is filled in automatically. Logistics list, adviser's calendar, dashboard and statistics all stay consistent.

Status synced with stages

Finish every stage (✓ everywhere) → the contract status changes to "Completed". Untick one → back to "In progress". No manual updates.

Showroom filter on the calendar

Several branches? Pick one from the drop-down and the calendar shows only its crews and its contracts. A regional logistics coordinator sees their own, the manager sees everything.

Contract preview (sidebar)

Click the icon next to the card number → a sidebar with the customer's contact details and a tap-to-call phone number, statistics, recent contracts, installation scope, stages on a timeline and items. Without leaving the calendar.

Customer preview on hover

Hover over a customer's name in the list → a tooltip with phone, e-mail, address, showroom, number of open contracts, total sales and the 3 latest contracts. No navigating away.

Inline status changer

In every list row and queue card — a status drop-down whose menu is rendered above the table, so it never gets clipped. 8 pipeline statuses with descriptions and colour dots. A compact mode for dense views.

Bulk actions

Select several contracts (Shift+click) and an action bar appears at the bottom: change status, mark as completed, change installer, export to CSV. 50 contracts handled in one click.

Printouts

Three PDFs for every installation

One click in the calendar sidebar generates the printouts. Each carries your company branding (logo, name, tax number, address, bank account), ready to print or send by e-mail.

Installation order

A printout for the crew: installation address, contact, stages (date + time + installer), specification with dimensions and room, scope of work, notes and space for signatures. The title switches to "Delivery order" by itself when the contract has no installation.

Acceptance protocol

A printout for the customer to sign once installation is finished: a statement that the work is done, a list of accepted items with checkboxes, space for comments and defects, a tick box for "accepted with/without reservations" and signatures. For a delivery-only job — a goods handover protocol.

Contract printout

From the calendar sidebar, opens a PDF in the company's default contract template or another one you choose. Logo, branding, your contract terms and transfer details for the company's or the showroom's bank account.

Get started

Schedule your first installation in 2 minutes.

14 days free. Your crews, your statuses, your PDF templates — set them up once.

Create an account
Several crews?

Every crew its own calendar, one view for the manager.

External subcontractors without a system account, holidays, several showrooms. The manager sees the workload of every crew at once.

Get in touch