Who does what in a window showroom: dividing responsibility for each job
Jobs don't get lost in the middle of a stage, they get lost at the handover. Seven handover points, two roles you need to separate, and three numbers that show whether it's working.

This is not a story about incompetence. It is a story about a handover point with no owner. A job in a window and door showroom passes through six or seven pairs of hands, and it almost always gets lost at a handover, never in the middle of a stage — because in the middle of a stage someone is holding it. Below we look at how to assign responsibility so that handovers stop being the place where work disappears: where exactly the handover points are, how the job owner differs from the stage owner, what has to be recorded at each handover, and how to check that it works without taking anyone's word for it.
“Everyone's on it” means “nobody is”
In a small showroom, dividing up responsibilities seems unnecessary: everyone sits in the same room and sees everything. That works with five open jobs. At twenty it stops working, and not gradually but quite abruptly — because the number of things to remember grows faster than the number of jobs. Every job has several open threads, every thread has a status, and statuses change without warning.
The symptoms are easy to recognise. Someone asks “who's handling this one?” about a job from a month ago. A customer calls three different people and gets a different version each time. An order is placed with the manufacturer twice, because two people were each sure it hadn't been done. All three have the same cause: the job has many owners, which means it has none.
Two roles you need to separate
The most common mistake when assigning responsibilities is trying to give the whole job to one person from start to finish. When you sell with installation, that doesn't work — the sales adviser won't go out to fit the windows, and the installer won't price the quote. You need two different roles, and separating them is the heart of the matter.
Stage owner
The person who carries out a specific step and is responsible for its result: the surveyor for the measurement report, the sales adviser for the quote and contract, the fulfilment person for the order and keeping track of the delivery date, the crew leader for the installation and handover. The stage owner changes as the job moves through stages, and that is perfectly normal.
Job owner
One person for the whole journey, from first contact to final settlement. They don't carry out every step — they make sure the job keeps moving, and they are the customer's point of contact. They are the one who notices that something has been stuck for three weeks, because they are the only one looking at the job as a whole. In most showrooms the natural job owner is the sales adviser who made the sale.
Without this separation, one of two things happens. Either the job owner tries to do every stage and becomes a bottleneck, or the stages are split up with no job owner and the job gets lost at a handover — exactly as in the situation described above.
Seven points where a job changes hands
It is worth writing them out, because only on a list do you see how many there are — and each one is a place where work can stall.
- Enquiry → measurement. Who books the appointment and who confirms it with the customer the day before.
- Measurement → quote. Who transfers the dimensions into the quote, and within how many days of the visit.
- Quote → contract. Who follows up with the customer after sending it, and after how many days.
- Contract → order. What exactly releases the order: the signature, the deposit, the colour sign-off. This is where most jobs get lost.
- Order → delivery. Who keeps an eye on the date confirmed by the manufacturer, and who reacts when it slips.
- Delivery → installation. Who agrees the date with the crew and who checks that the openings are ready.
- Installation → settlement. Who collects the acceptance protocol, who issues the final invoice and who closes the job.
The fourth point deserves special attention, because it is the one that failed in the opening story. “Contract signed” and “order ready to place” are not the same thing if the colour still hasn't been confirmed or the measurement report hasn't been approved. Until the release condition is written down explicitly, everyone assumes someone else has taken care of it.
What has to be left behind at a handover
A verbal handover only works when both people are in the same room and nothing distracts them — in other words, rarely. For a handover to be effective, three things have to remain after it.
A dated record. When the job changed stage and who handed it over. Without a date you can't later work out how long it sat and where, so you can't improve the process — all that's left is looking for someone to blame, which fixes nothing.
The condition that was met. Not “the job is going to fulfilment”, but “contract signed, deposit received on 27 March, colour approved”. The person taking over must be able to see there is nothing left to wait for.
A named recipient. One person by name, not a department. “Passed to fulfilment” is not a handover, because no specific person received it. This is the most common way jobs get lost in a business that has already defined its stages.
Cover for holidays and absences
A division of responsibilities proves itself not in an ordinary week, but when the job owner is away for two weeks in the middle of summer. If their jobs have nobody assigned for that time, they come back two weeks behind, along with a pile of complaints from customers who spent the interim calling into the void.
The fix is simple and takes one decision, not a procedure: for any absence longer than a few days, the jobs get a named stand-in, and the customers on those jobs are told who to contact. Make sure the cover also includes access to what's needed: if everything agreed with the customer sits in the adviser's personal inbox or phone, the stand-in has nothing to work with, however willing they are.
How to check that it works
Saying that your division of responsibilities works is worthless. You can check it with three numbers, and you need nothing more than a list of jobs.
- Jobs with no movement for more than fourteen days. This is the real measure. Each such job is stuck at a specific handover point — and a recurring point shows you which handover needs fixing.
- Jobs without an assigned owner. There should be none. Any you find are jobs nobody is thinking about until the customer calls.
- Time between stages. Especially from measurement to quote and from contract to order. These are the two stretches where the most time is lost — and also the two easiest to shorten.
If you're doing this for the first time, start with the first number, using jobs from the last three months. That is usually enough to see a pattern — and it usually turns out that the problem isn't the people, but one specific handover where nobody is responsible for picking the job up.
Where software fits in
No system will decide for you who should pick up a job once the contract is signed — that is a decision, not a feature. What a system can do is two things a spreadsheet won't: make sure every job has someone assigned, and show you the ones that are stuck. Roles and permissions define who sees what and who can close a stage, and the dashboard lists the jobs that need attention instead of waiting for someone to ask.
The order matters here, and it often gets reversed: first decide who is responsible for what, then reflect that in the software. Rolling out a system on top of an unclear division of responsibilities gives you an unclear division of responsibilities with notifications.
Disclaimer
This article describes organisational practice common in window and door showrooms. It is not legal or HR advice — employees' duties, their responsibility and cover arrangements are governed by employment contracts, internal policies and employment law, not by the way a business divides up its stages.
All of this happens on its own when documents come out of the system.
The contract template brings in your terms for a private customer or a business, the measurement turns into a quote and the complaint keeps track of the reply deadline.