Changing or cancelling a window order with the manufacturer: when is it too late?

The customer calls on Monday: anthracite after all. The profiles have been cut since Friday, and the contract says nothing about the cost of changes. When a manufacturer order becomes binding, and how to put it in writing before that call comes.

Alstre Team8 min read
A window order placed with the manufacturer. When can changes still be made?

This is one of the most expensive things that can happen in a showroom, because made-to-measure windows and doors have no second-hand market: a window in an odd size and colour will not go to the next customer. Someone has to absorb the cost, and when nothing is in writing, it is the showroom. Below: when a manufacturer order becomes binding, what the manufacturer's terms of sale actually say, the four clauses that protect your contract with the customer (including a statement of individual specification), what to check in the order confirmation before you accept it, and what happens when the mistake is yours.

The point of no return comes earlier than the customer thinks

The customer assumes that if installation is six weeks away, the first three are still open for changes. In reality the order closes within hours of being sent, because production plans batches in advance and the profiles and glass units are ordered further down the chain.

That gap in expectations is the root of the whole problem, and you can remove it with one sentence at signing: “Once we approve the measurement and send the order, any change will be charged. If you are still weighing anything up, now is the time.”

Said at signing, that sentence is information. The same sentence said on Monday is bad news and sounds like an excuse.

The manufacturer's terms of sale: read them once, calmly

Your relationship with the manufacturer is business-to-business, so it runs on what the two of you agreed rather than on consumer protection rules. In practice the manufacturer's general terms of sale decide everything: the document you sign once when you start working together and nobody reads again.

Four things are worth copying out and keeping to hand, because each of them will at some point decide who pays:

  • When an order becomes binding: on sending or only on confirmation, and how quickly the manufacturer confirms.

  • Change and cancellation fees: usually tiered, with one rate before production starts and another after. This is the figure you need to know before you promise the customer anything.

  • Dimensional tolerances: the permitted deviations of the finished product. Without them you cannot tell whether a sash a few millimetres narrower is a defect or within spec.

  • Lead times and how firm they are: whether the stated date is binding or “approximate”. If it is approximate, the whole risk of delay towards the customer stays with you, so build a margin into every date you give.

The manufacturer order is not the same contract as the customer's

It sounds obvious, yet in practice the two are often treated as one. They are not: they have different parties, different deadlines and different rules on liability. Your contract with the customer may allow a free change within 48 hours, and the manufacturer does not care, because it is not a party to that contract. Every right you give the customer must first be covered on the manufacturer's side, otherwise you are paying for it out of your own pocket.

A showroom adviser and a customer reading a window manufacturer's contract, with the clause on no changes after the order goes into production highlighted

What to put in the contract with the customer

You need four elements, and all of them have to be on the table before signing, not after.

The point from which changes are charged. Ideally tied to an event rather than a number of days: approval of the measurement record, or the order being sent to the manufacturer. An event can be pointed to in the paperwork; “three days” has to be counted from something.

How the cost of a change is worked out. Not a figure plucked from the air, but a reference to the actual charge from the manufacturer plus any labour. It is fair and easy to defend, because you can show the invoice.

A window for free changes. Surprisingly, this clause works in your favour: a short, clearly limited period for corrections turns the conversation into one about the deadline, not about whether a change is owed at all. There is one condition: the window must close before the order moves on.

A statement of individual specification. A separate sentence in which the buyer confirms that the windows and doors are made to their requirements (the dimensions in the measurement record, the chosen colour, hardware and glazing) and are therefore not goods that can be returned or resold to someone else. In the contract, this sentence explains to the customer why a change after the order has been sent costs money.

The parties agree that the subject of this contract is manufactured to the Buyer's individual specification, based on measurement record no. … and on the Buyer's choice of colour, hardware and glazing. The Buyer acknowledges that once the order has been passed to production, it cannot be changed or withdrawn without costs borne by the Buyer, in the amount charged to the Seller by the manufacturer.

Two things to keep in mind about this clause. First, it creates nothing; it only records the facts. Whatever statutory rights a consumer has stay in place, and no contract term can take them away. Its value is that in a dispute you do not have to prove the goods really were made to order: the customer has confirmed it with a signature.

Second, returning the product and changing the order are two different matters. The fact that a made-to-measure window cannot simply be returned does not mean the customer cannot ask for a different colour. They can, but it is a paid change. That is why both points belong in the contract separately: why the product cannot be returned, and what a change costs.

The order confirmation: five minutes that save the job

The manufacturer's confirmation is the last moment when a mistake can be fixed for free. It usually arrives by email and usually nobody reads it, because “we sent what was in the measurement anyway”.

Check the same things every time, in the same order:

  • Dimensions: item by item, against the measurement record, not from memory.

  • Opening side: the classic mistake of this trade and the most common one, which only shows up at installation.

  • Colour on both sides: a different colour inside and outside means separate items and separate mistakes.

  • Glass and glazing units: especially where one item differs from the rest of the order.

  • Accessories: handles, trickle vents, thresholds, night ventilation.

  • Delivery date: does it match what you promised the customer, with a margin?

The check needs a named owner. A task done by “whoever sees the email first” is done by nobody. More on that in the guide on who does what in the showroom.

When the mistake is on your side

It happens, and then the same rule applies as with any other damage: fix it for the customer first, work out who was at fault later. The customer has no contract with the manufacturer and does not care whether the wrong dimension was entered by your surveyor or by an operator at the factory.

The internal settlement is a separate matter and depends on whether the error came from the measurement or from the order. In these cases the paperwork settles things immediately or not at all: if the measurement record and the order confirmation match, the fault lies with production and it is a five-minute conversation. If the wrong dimension was already in the record, the question goes to whoever did the measuring.

What to record

With one job you remember everything. With twenty running in parallel, the question “was this order confirmed, and who checked it?” gets asked when it is already too late.

For every job, keep: the manufacturer's order number, the date it was sent, the date and content of the confirmation, who checked it, every later change with its date and cost, and who approved it on the customer's side. The last item is the one most often missing: a change agreed over the phone and written down nowhere is a change nobody wants to pay for.

Consistent order and document numbering lets you link the manufacturer's order number, the customer contract and the invoice in one step. In a dispute about what was actually ordered, that is the only thing that counts.

Alstre

All of this happens on its own when documents come out of the system.

The contract template brings in your terms for a private customer or a business, the measurement turns into a quote and the complaint keeps track of the reply deadline.